Some Specifications of the 300 MW Combined-Cycle Power Unit of the Yugo-Zapadnaya TÉTs
- Авторы: Kostyuk R.1, Chugin A.1, Radin Y.2, Razogreev V.3
-
Учреждения:
- JSC “South-West TPP”
- JSC “All-Russia Thermal Engineering Institute”
- ENEKS
- Выпуск: Том 51, № 3 (2017)
- Страницы: 329-331
- Раздел: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245807
- DOI: https://doi.org/10.1007/s10749-017-0833-9
- ID: 245807
Цитировать
Аннотация
Specifications of 300 MW combined-cycle power unit No. 2 of the Yugo-Zapadnaya TÉTs (St. Petersburg) are presented. They were obtained as a result of testing and commissioning of the unit.
Об авторах
R. Kostyuk
JSC “South-West TPP”
Email: vti-unit@yandex.ru
Россия, St. Petersburg
A. Chugin
JSC “South-West TPP”
Email: vti-unit@yandex.ru
Россия, St. Petersburg
Y. Radin
JSC “All-Russia Thermal Engineering Institute”
Автор, ответственный за переписку.
Email: vti-unit@yandex.ru
Россия, Moscow
V. Razogreev
ENEKS
Email: vti-unit@yandex.ru
Россия, Krasnodar