Experience with Operation of the Hydroelectric Power Equipment at the Votkinsk HPP
- Authors: Chekunov A.I.1, Nikonov A.A.2
-
Affiliations:
- First chief of turbine department, veteran of the Votkinsk HPP
- Votkinsk HPP, branch of JSC RusHydro
- Issue: Vol 51, No 1 (2017)
- Pages: 29-32
- Section: Article
- URL: https://journals.rcsi.science/1570-145X/article/view/245566
- DOI: https://doi.org/10.1007/s10749-017-0778-z
- ID: 245566
Cite item
Abstract
This article deals with the experience of operating the Votkinsk HPP, one of the largest hydroelectric power plants in the Volga-Kama cascade. The engineering decisions and ideas used to solve the problems confronted by hydroelectric power engineers are examined.
Keywords
About the authors
A. I. Chekunov
First chief of turbine department, veteran of the Votkinsk HPP
Email: nikonovaa@votges.rushydro.ru
Russian Federation, Votkinsk
A. A. Nikonov
Votkinsk HPP, branch of JSC RusHydro
Author for correspondence.
Email: nikonovaa@votges.rushydro.ru
Russian Federation, Votkinsk