Radiation Inspection of the RFT Reactor Wastewater Treatment Plant


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

At the National Research Center Kurchatov Institute, disassembly work is being done on research reactors and work on the disassembly of reactors’ technological systems located in buildings neighboring the central reactor hall is being planned. Radiation inspection of the room housing the water treatment system and the ventilation pipe is being done to optimize disassembly. The wastewater treatment system includes six metal compartments, arranged around the base of the ventilation pipe, and two monte-jus. Four radiation inspection openings were drilled in the top cover of the room housing the water treatment system and the wall of the ventilation pipe. A video survey of the rooms was done through these openings and the exposure dose rate and activity of the primary radionuclides over the height of the rooms and inside the ventilation pipe was measured. The results were used to optimize the disassembly of the equipment and to evaluate the amount of radioactive waste.

作者简介

A. Volkovich

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

Yu. Simirskii

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

A. Stepanov

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

S. Smirnov

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

A. Safronov

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

I. Semin

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

V. Stepanov

National Research Center Kurchatov Institute

Email: j-atomicenergy@yandex.ru
俄罗斯联邦, Moscow

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2018