Results are presented of a full-scale study to assess the seismic stability of the spillway tunnels at the Kapchagai HPP in connection with an increase in the seismic rating of the site. Tests of the concrete used in the tunnel lining and of the surrounding rock determined the physical and mechanical properties of the materials and calculations were carried out for an earthquake load of intensity 8 on the facility. Calculations were carried out using the Tunnel' program package (developed by the authors) and ANSYS program package. Zones were identified in the tunnel lining where hazardous tensile stresses may potentially occur. It is shown that the existing spillway tunnels are seismically stable.

作者简介

T. Abakanov

Seismology Institute (LLP)

Email: smfe@mail.ru
哈萨克斯坦, Almaty

A. Begalinov

Satpaev Kazakh National Technical University

Email: smfe@mail.ru
哈萨克斯坦, Almaty

A. Abakanov

Satpaev Kazakh National Technical University

Email: smfe@mail.ru
哈萨克斯坦, Almaty

补充文件

附件文件
动作
1. JATS XML

版权所有 © Springer Science+Business Media New York, 2016