Large Oil Tank Settlement and Tilt During Hydraulic Testing
- Autores: Dimov L.A.1, Dimov I.L.2, Bogushevskaya E.M.3
-
Afiliações:
- RSSMGFE
- Scientific-Research Institute, Transneft’ JSC
- Moscow State Commission of Experts
- Edição: Volume 54, Nº 3 (2017)
- Páginas: 192-197
- Seção: Construction Experience
- URL: https://journals.rcsi.science/0038-0741/article/view/244106
- DOI: https://doi.org/10.1007/s11204-017-9457-1
- ID: 244106
Citar
Resumo
An example of the development of settlement and inadmissible tilt of an oil tank during hydraulic testing is presented. Data from engineering and geological research as well as a combined numerical calculation of the base and foundation by the finite-element method did not permit predicting the considerable tilt of the tank during hydraulic testing.
Sobre autores
L. Dimov
RSSMGFE
Email: smfe@mail.ru
Rússia, Velikii Ustyug
I. Dimov
Scientific-Research Institute, Transneft’ JSC
Email: smfe@mail.ru
Rússia, Moscow
E. Bogushevskaya
Moscow State Commission of Experts
Email: smfe@mail.ru
Rússia, Moscow
Arquivos suplementares
