Improvement of the Electric Arc Furnace Manufacture of R6M5 Steel
- 作者: Gertsyk S.1, Korolev M.1, Shil’nikov E.2
-
隶属关系:
- Moscow Polytechnic University
- AO Metallurgical Plant Electrostal
- 期: 卷 2019, 编号 12 (2019)
- 页面: 1245-1249
- 栏目: Manufacture of Ferrous and Nonferrous Metals
- URL: https://journals.rcsi.science/0036-0295/article/view/173731
- DOI: https://doi.org/10.1134/S0036029519120085
- ID: 173731
如何引用文章
详细
The process of making R6M5 steel by remelting with oxygen blowing in a 20-t electric arc furnace is considered. To improve the technical-and-economic indices of the furnace operation, the following measures are tested on a series of pilot heats: the introduction of oxygen under the metal melt surface in a molten-metal bath using a consumable uncooled tube and heating of the scrap in a charging bucket by effluent gases to a temperature of 250–370°C. These measures lead to a decrease in the heat time, the metal loss, and the specific consumption of electric power and oxygen.
作者简介
S. Gertsyk
Moscow Polytechnic University
编辑信件的主要联系方式.
Email: gertsyk@mail.ru
俄罗斯联邦, Moscow, 107023
M. Korolev
Moscow Polytechnic University
Email: gertsyk@mail.ru
俄罗斯联邦, Moscow, 107023
E. Shil’nikov
AO Metallurgical Plant Electrostal
Email: gertsyk@mail.ru
俄罗斯联邦, Elektrostal, Moscow oblast, 144002