Application of Multi-Vertical Well Synchronous Hydraulic Fracturing Technology for Deep Coalbed Methane (DCBM) Production


如何引用文章

全文:

开放存取 开放存取
受限制的访问 ##reader.subscriptionAccessGranted##
受限制的访问 订阅存取

详细

In this paper, we propose a method for multi-vertical well synchronous hydraulic fracturing and compare with synchronous fracturing technologies used in shale. Based on theoretical analysis and triaxial fracturing experiments, we have shown that “face interference” in multi-vertical well synchronous fracturing helps to connect the cleats and generate complex fracture networks. The developed three-step method for designing synchronous fracturing technology was tested under field conditions. The results showed that application of synchronous fracturing decreases the gas breakthrough time in the wells and increases DCBM (deep coalbed methane) production. Furthermore, stress interference generated by synchronous fracturing has a positive impact on the production rate of wells adjacent to the experimental area.

作者简介

Zhaozhong Yang

State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University

编辑信件的主要联系方式.
Email: yangzhaozhongswpu@163.com
中国, Chengdu

Rui He

State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University

Email: yangzhaozhongswpu@163.com
中国, Chengdu

Xiaogang Li

State Key Laboratory of Oil and Gas Reservoir Geology and Exploitation, Southwest Petroleum University

Email: yangzhaozhongswpu@163.com
中国, Chengdu

Zhanling Li

China Nuclear Engineering & Construction Group Corporation Limited

Email: yangzhaozhongswpu@163.com
中国, Beijing

Ziyuan Liu

Sichuan Energy Investment Group Co., Ltd

Email: yangzhaozhongswpu@163.com
中国, Chengdu

Yanjun Lu

Moscow Lomonosov State University

Email: yangzhaozhongswpu@163.com
俄罗斯联邦, Moscow


版权所有 © Springer Science+Business Media, LLC, part of Springer Nature, 2019
##common.cookie##